低氮燃烧器30-80mg 利雅路FGR系列
1.00/台
上海
最小起订≥1台
供货总量20台
有效期长期有效
产品详情推荐
产品属性
加工定制
烟气外循环
型号
RS200 BLU FGR RS410BLU FGR
燃料
燃气
类型
工业燃烧器
所有参数

5.5.1 Boring the boiler plate

Drill the combustion chamber locking plate as shown in Fig. 12

(Tab. J). The position of the threaded holes can be marked using

the thermal screen supplied with the burner.

Tab. J

5.5.2 Blast tube length

The length of the blast tube must be selected according to the in-

dications provided by the manufacturer of the boiler, and in any

case it must be greater than the thickness of the boiler door com-

plete with its fettling.

For boilers with front flue passes 1)(Fig. 13) or flame inversion

chamber, a protection in refractory material 5) must be inserted

between the boiler fettling 2) and the blast tube 4).

The refractory can have a conical shape (minimum 60°).

This protective fettling must not compromise the extraction of the

blast tube.

For boilers with a water-cooled front piece, a refractory lining 2)-

5)(Fig. 13) is not necessary, unless expressly requested by the

boiler manufacturer.

5.6 Securing the burner to the boiler

➤ Fit the heat insulation supplied onto the blast tube

4)(Fig. 13).

➤ Fit the entire burner onto the boiler hole prepared previously

(Fig. 12), and fasten with the screws supplied.

WARNING

➤ The burner is designed to operate only in

positions  1 ,  2 ,  3  and 4  (Fig. 11).

➤ Installation  1 is preferable, as it is the only

one that allows the maintenance operations

as described in this manual.

➤ Installations  2 ,  3  and  4 permit operation but

make maintenance and inspection of the

combustion head more difficult.

DANGER

➤ Any other position could compromise the cor-

rect operation of the appliance.

➤ Installation  5 is prohibited for safety reasons.

Fig. 11

2 3 4 5 1

D7739

mm A B C

RS 510/E BLU  335 452 M18

RS 610/E BLU  350 452 M18

Fig. 12

D455

Prepare a suitable lifting system using the rings

3)(Fig. 13), after removing the fixing screws 7) of

the casing 8).

WARNING

The seal between burner and boiler must be

airtight.



免责声明:当前页为 低氮燃烧器30-80mg 利雅路FGR系列产品信息展示页,该页所展示的 低氮燃烧器30-80mg 利雅路FGR系列产品信息及价格等相关信息均有企业自行发布与提供, 低氮燃烧器30-80mg 利雅路FGR系列产品真实性、准确性、合法性由店铺所有企业完全负责。世界工厂网对此不承担任何保证责任,亦不涉及用户间因交易而产生的法律关系及法律纠纷,纠纷由会员自行协商解决。

友情提醒:世界工厂网仅作为用户寻找交易对象,就货物和服务的交易进行协商,以及获取各类与贸易相关的服务信息的渠道。为避免产生购买风险,建议您在购买相关产品前务必确认供应商资质及产品质量。过低的价格、夸张的描述、私人银行账户等都有可能是虚假信息,请您谨慎对待,谨防欺诈,对于任何付款行为请您慎重抉择。

投诉方式:fawu@gongchang.com是处理侵权投诉的专用邮箱,在您的合法权益受到侵害时,请将您真实身份信息及受到侵权的初步证据发送到该邮箱,我们会在5个工作日内给您答复,感谢您对世界工厂网的关注与支持!

上海福奈机电设备有限公司
进入店铺
2011成立时间
联系方式 企业档案

电话13472635686

传真021-50569945

手机13472635686

QQ467271800

地址上海市浦东新区龚丰路185号

工商信息
统一社会信用代码91310116570789971W
成立日期2011年03月18日
组织机构代码570789971
经营状态存续
法定代表人魏丽娜
店铺推荐
全部产品
更新时间:2024-03-02
首页 分类 世界工厂 我的 客服
产品属性
加工定制
烟气外循环
型号
RS200 BLU FGR RS410BLU FGR
燃料
燃气
类型
工业燃烧器
别名
低氮燃烧器
适用范围
蒸汽锅炉 热水锅炉 等
发热量
200-1000万大卡
供气压力
12-28KPA
燃料消耗
150-890立方米
外形尺寸
350-1150
重量
75-180
品牌
利雅路
关闭
功能直达
首页
产品二维码
搜索
消息
全站同款
意见反馈
用小程序访问该企业,关注及对接
点击保存二维码,微信扫一扫识别
全部分类
工业品
原材料
消费品
智能制造
人工智能
双碳
新能源汽车
农业畜牧
宠物园艺
商务服务